All posts by admin

MOVING CATERPILLAR EXCAVATOR (CAT385C) RIG

MOVING CATERPILLAR EXCAVATOR (CAT385C) RIG

Home Client: — Project Value: — Date: — Category: — Project Information Weight: 114. Ton CAT385C with all accessories. Overweight , Oversize Units with other several parts ,extra length...

Read More
POWER CABLES FOR BAGHDAD-IRAQ

POWER CABLES FOR BAGHDAD-IRAQ

Home Client: — Project Value: — Date: — Category: — Project Information Electrical Cables on Reels with 350 cm diameter, 15 ton Each Scope of work: Trans-loading (from Kuwaiti...

Read More
TELE-COMMUNICATION TOWERS (ZAIN IRAQ)

TELE-COMMUNICATION TOWERS (ZAIN IRAQ)

Home Client: — Project Value: — Date: — Category: — Project Information Quantity:200 Tower within 200 x HC 40’ ft. Cont. Delivery locations: To several Governorates: Basra, Baghdad and...

Read More
UNITED NATIONS / CONGO PROJECT

UNITED NATIONS / CONGO PROJECT

Home Client: — Project Value: — Date: — Category: — Project Information This is a distinguished project which we conducted for UN from scratch with full preparation and proper...

Read More
Japanese Grants Jordan-Iraq

Japanese Grants Jordan-Iraq

Home Client: — Project Value: — Date: — Category: — Project Information ALNAHRAIN is proud to have an ongoing business contract since 2014 with Toyotsu Logistics Service Co. Japan...

Read More
  • 1
  • 2